CE3013 Advanced Construction Techniques Notes
Download CE3013 Advanced Construction Techniques Books, Lecture Notes, Part-A 2 marks with answers, Part-B 16 marks Questions, PDF Books. In this Notes Very Useful for Third Year Fifth Semester Students.
“CE3013 Advanced Construction Techniques Books”
“CE3013 Advanced Construction Techniques Lecture Notes”
“CE3013 Advanced Construction Techniques Study Material”
“CE3013 Advanced Construction Techniques Notes”
Subject Info:
Semester | Fifth Semester |
Department | CIVIL |
Year | Third Year |
Regulation | R 2021 |
Subject Code / Name | CE3013 Advanced Construction Techniques |
Content | Local Authors Books, Lecture Notes |
Syllabus:
CE3013 Advanced Construction Techniques
UNIT I SUB STRUCTURE CONSTRUCTION
Construction Methodology – Box jacking – Pipe jacking – Under water construction of diaphragm walls and basement – Tunneling techniques – Piling techniques – Driving well and caisson – sinking cofferdam – cable anchoring and grouting – Driving diaphragm walls, Sheet piles – Laying operations for built up offshore system – Shoring for deep cutting – Large reservoir construction – well points – Dewatering for underground open excavation.
UNIT II SUPER STRUCTURE CONSTRUCTION FOR BUILDINGS
Vacuum dewatering of concrete flooring – Concrete paving technology – Techniques of construction for continuous concreting operation in tall buildings of various shapes and varying sections – Erection techniques of tall structures, Large span structures – launching techniques for heavy decks – in-situ prestressing in high rise structures, Post tensioning of slab- aerial transporting – Handling and erecting lightweight components on tall structures.
UNIT III CONSTRUCTION OF SPECIAL STRUCTURES
Erection of lattice towers – Rigging of transmission line structures – Construction sequence in cooling towers, Silos, chimney, sky scrapers – Bow string bridges, Cable stayed bridges – Launching and pushing of box decks – Construction of jetties and break water structures – Construction sequence and methods in domes – Support structure for heavy equipment and machinery in heavy industries – Erection of articulated structures and space decks.
UNIT IV REHABILITATION AND STRENGTHENING TECHNIQUES
Seismic retrofitting – Strengthening of beams – Strengthening of columns – Strengthening of slab – Strengthening of masonry wall, Protection methods of structures, Mud jacking and grouting for foundation – Micro piling and underpinning for strengthening floor and shallow profile – Sub grade water proofing, Soil Stabilization techniques.
UNIT V DEMOLITION
Demolition Techniques, Demolition by Machines, Demolition by Explosives, Advanced techniques using Robotic Machines, Demolition Sequence, Dismantling Techniques, Safety precaution in Demolition and Dismantling.
CE3013 Advanced Construction Techniques Lecture Notes
CE3013 Advanced Construction Techniques Lecture Notes – DOWNLOAD
CE3013 Unit 1 Topic wise Lecture Notes Collection
1.1 BOX JACKING AND PIPE JACKING – DOWNLOAD
1.2 DIAPHRAGM WALL – DOWNLOAD
1.3 TUNNELING – DOWNLOAD
1.4 CAISSONS – DOWNLOAD
1.5 COFFERDAM – DOWNLOAD
CE3013 Unit 2 Topic wise Lecture Notes Collection
2.1 OFF SHORE PLATFORM – DOWNLOAD
2.2 THIN SHELL CONSTRUCTION – DOWNLOAD
2.3 HEAVY EQUIPMENTS FOR LAUNCHING – DOWNLOAD
2.4 DOME STRUCTURS – DOWNLOAD
2.5 INSITU PRE STRESSING – DOWNLOAD
CE3013 Unit 3 Topic wise Lecture Notes Collection
3.1 ERECTION OF LATTICE TOWERS – DOWNLOAD
3.2 COOLING TOWER – DOWNLOAD
3.3 BOWSTRING GIRDER BRIDGE – DOWNLOAD
3.4 ERECTION OF ARTICULATED STRUCTURS – DOWNLOAD
3.5 CONSTRUCTION OF JETTY BREAKWATER – DOWNLOAD
CE3013 Unit 4 Topic wise Lecture Notes Collection
4.1 SEISMIC RETROFITTING – DOWNLOAD
4.2 STRENGTHENING OF BEAMS AND COLUMNS – DOWNLOAD
4.3 STRENGTHENING OF MASONRY WALLS – DOWNLOAD
4.4 UNDERPINNING – DOWNLOAD
4.5 SOIL STABILIZATION TECHNIQUES – DOWNLOAD
CE3013 Unit 5 Topic wise Lecture Notes Collection
5.1 DEMOLIATION TECHNIQUE – DOWNLOAD
5.2 METHODS OF DEMOLITION – DOWNLOAD
5.3 DEMOLITION BY EXPLOSIVES – DOWNLOAD
5.4 SAFETY IN DEMOLITION – DOWNLOAD